Hydrogen and oxygen flow out of the electrolyser through their respective convergence channels together with the lye and enter the gas separator. Due to gravity, the hydrogen (oxygen) and lye are settled and separated.The separated hydrogen (oxygen) comes out of the upper part of the separator and enters the hydrogen (oxygen) heat exchanger where it is cooled. Liquid droplets are removed from the top of the separator through the hydrogen washing separator. The hydrogen is then controlled by a hydrogen regulating valve and sent downstream.
Main Features
1. Optimized electrode structure & nickel-plating process, leading to higher performance.
2. New material and technology diaphragm with higher current density and environment sustainable.
3. Optimized gasket and frame sealing of bipolar plate design with longer lifespan.
4. Optimized gas-liquid flow field with higher flow equalization efficiency.
5. Compact structure of lye cooling with high heat exchange efficiency.
| Item | Unit | GFGL-200/1.6(3.2) | GFGL-500/1.6 | GFGL-1000/1.6 |
| Hydrogen treatment capacity | Nm3/h | 200 | 500 | 1000 |
| Purity of hydrogen at the outlet | % | ≥99.8 | ≥99.8 | ≥99.8 |
| Purity of oxygen at the outlet | % | ≥98.5 | ≥98.5 | ≥98.5 |
| Temperature of hydrogen at the outlet | ℃ | <40 | <40 | <40 |
| Dimensions of Gas-liquid separation skid | mm | 3000*2700*3800 | 5400*3200*3950 | 4800*3600*5800 |
| Weight of Gas-liquid separation skid | KG | 8000 | 11000 | 20000 |

Location: UAE
Capacity: 50 Nm³ per hour
Pressure: 16 bar
This is GF's containerized integrated AWE solution for UAE customer who is eager to pilot the energy transition, it is under commissioning now with features of significantly reduced on-site manhours.

Location: Jiangsu, China
Capacity: 1000 Nm³ per hour
Pressure: 16 bar
This project is one of the first AWE system in Jiangsu province, the green hydrogen is used by industrial end user in chemical industry and has already been in operation for more than 1 year. The entire system including BOP is supplied by GF.

Location: Zhejiang, China
Capacity: 50 Nm³ per hour
Pressure: 16 bar
This is GF's first containerized all-in-one integrated AWE solution for green hydrogen generation, which features easier deployment, erection and commissioning.